\begin{thebibliography}{}

\bibitem[\protect\citeauthoryear{Baluja}{1995}]{baluja1995}
Baluja, S.
\newblock 1995.
\newblock An empirical comparison of seven iterative and evolutionary function
  optimization heuristics.
\newblock Technical Report CMU-CS-95-193, Carnegie Mellon University.

\bibitem[\protect\citeauthoryear{Bensana, Lemaitre, \&
  Verfaillie}{1999}]{Bensana1999}
Bensana, E.; Lemaitre, M.; and Verfaillie, G.
\newblock 1999.
\newblock Earth observation satellite management.
\newblock {\em Constraints} 4(3):293--399.

\bibitem[\protect\citeauthoryear{Bresina}{1996}]{bresina1996}
Bresina, J.
\newblock 1996.
\newblock Heuristic-biased stochastic sampling.
\newblock In {\em Proceedings of the Thirteenth National Conference on
  Artificial Intelligence}.

\bibitem[\protect\citeauthoryear{Chien \bgroup \em et al.\egroup
  }{2000}]{Chien2000}
Chien, S.; Rabideau, G.; Knight, R.; Sherwood, R.; Engelhardt, B.; Mutz, D.;
  Estlin, T.; Smith, B.; Fisher, F.; Barrett, T.; Stebbins, G.; and Tran, D.
\newblock 2000.
\newblock Aspen - automating space mission operations using automated planning
  and scheduling.
\newblock In {\em SpaceOps 2000, Toulouse, France, June 2000}.

\bibitem[\protect\citeauthoryear{Crawford \& Baker}{1994}]{crawford94}
Crawford, J.~M., and Baker, A.~B.
\newblock 1994.
\newblock Experimental results on the application of satisfiability algorithms
  to scheduling problems.
\newblock In {\em Proceedings of the Twelfth National Conference on Artificial
  Intelligence}.

\bibitem[\protect\citeauthoryear{Frank \bgroup \em et al.\egroup
  }{2001}]{Frank2001}
Frank, J.; Jonsson, A.; Morris, R.; and Smith, D.
\newblock 2001.
\newblock Planning and scheduling for fleets of earth observing satellites.
\newblock In {\em Proceedings of the 6th International Symposium on Artificial
  Intelligence, Robotics, Automation and Space 2001}.

\bibitem[\protect\citeauthoryear{Globus \bgroup \em et al.\egroup
  }{2002}]{Globus2002schedule}
Globus, A.; Crawford, J.; Lohn, J.; and Morris, R.
\newblock 2002.
\newblock Scheduling earth observing fleets using evolutionary algorithms:
  Problem description and approach.
\newblock In {\em Proceedings of the 3rd International NASA Workshop on
  Planning and Scheduling for Space}.

\bibitem[\protect\citeauthoryear{Globus \bgroup \em et al.\egroup
  }{2003}]{Globus2003SMCIT}
Globus, A.; Crawford, J.; Lohn, J.; and Pryor, A.
\newblock 2003.
\newblock Scheduling earth observing satellites with evolutionary algorithms.
\newblock In {\em Conference on Space Mission Challenges for Information
  Technology (SMC-IT)}.

\bibitem[\protect\citeauthoryear{Holland}{1975}]{Holland1975}
Holland, J.~H.
\newblock 1975.
\newblock {\em Adaptation in Natural and Artificial Systems}.
\newblock Oakland,CA: University of Michigan Press.

\bibitem[\protect\citeauthoryear{Husbands}{1994}]{Husbands1994}
Husbands, P.
\newblock 1994.
\newblock Genetic algorithms for scheduling.
\newblock {\em AISR Quarterly} (89).

\bibitem[\protect\citeauthoryear{Joslin \& Clements}{1999}]{Joslin1999}
Joslin, D.~E., and Clements, D.~P.
\newblock 1999.
\newblock Squeaky wheel optimization.
\newblock {\em Journal of Artificial Intelligence Research} 10:353--373.

\bibitem[\protect\citeauthoryear{Kirkpatrick, Gelatt, \&
  AndVecchi}{1983}]{Kirkpatrick1983}
Kirkpatrick, S.; Gelatt, C.~D.; and AndVecchi, M.
\newblock 1983.
\newblock Optimization by simulated annealing.
\newblock {\em Science} 220(4598):671--680.

\bibitem[\protect\citeauthoryear{Lamaitre \bgroup \em et al.\egroup
  }{2000}]{Lamaitre2000}
Lamaitre, M.; Verfaillie, G.; Frank, J.; Lachiver, J.; and Bataille, N.
\newblock 2000.
\newblock How to manage the new generation of agile earth observation
  satellites.
\newblock In {\em Proceedings of the International Symposium on Artificial
  Intelligence, Robotics and Automation in Space}.

\bibitem[\protect\citeauthoryear{Lamaitre, Verfaillie, \&
  Bataille}{1998}]{Lamaitre1998}
Lamaitre, M.; Verfaillie, G.; and Bataille, N.
\newblock 1998.
\newblock Sharing the use of a satellite: an overview of methods.
\newblock In {\em SpaceOps 1998}.

\bibitem[\protect\citeauthoryear{Potin}{1998}]{Potin1998}
Potin, P.
\newblock 1998.
\newblock End-to-end planning approach for earth observation mission
  exploitation.
\newblock In {\em SpaceOps 1998}.

\bibitem[\protect\citeauthoryear{Potter \& Gasch}{1998}]{Potter1998}
Potter, W., and Gasch, J.
\newblock 1998.
\newblock A photo album of earth: Scheduling landsat 7 mission daily
  activities.
\newblock In {\em SpaceOps 1998}.

\bibitem[\protect\citeauthoryear{Sherwood \bgroup \em et al.\egroup
  }{1998}]{Sherwood1998}
Sherwood, R.; Govindjee, A.; Yan, D.; Rabideau, G.; Chien, S.; and Fukunaga, A.
\newblock 1998.
\newblock Using aspen to automate eo-1 activity planning.
\newblock In {\em Proceedings of the 1998 IEEE Aerospace Conference}.

\bibitem[\protect\citeauthoryear{Smith, Engelhardt, \& Mutz}{2001}]{smith2001}
Smith, B.; Engelhardt, B.; and Mutz, D.
\newblock 2001.
\newblock Reducing costs of the modified antarctic mapping mission through
  automated planning.
\newblock In {\em Fourth International Symposium on Reducing the Cost of
  Spacecraft Ground Systems and Operations, 2001}.

\bibitem[\protect\citeauthoryear{Syswerda \& Palmucci}{1991}]{Syswerda1991}
Syswerda, G., and Palmucci, J.
\newblock 1991.
\newblock The application of genetic algorithms to resource scheduling.
\newblock In {\em Proceedings of the Fourth International Conference on Genetic
  Algorithms},  502--508.

\bibitem[\protect\citeauthoryear{Watson \bgroup \em et al.\egroup
  }{1999}]{watson99algorithm}
Watson, J.-P.; Barbulescu, L.; Howe, A.~E.; and Whitley, D.
\newblock 1999.
\newblock Algorithm performance and problem structure for flow-shop scheduling.
\newblock In {\em {AAAI}/{IAAI}},  688--695.

\bibitem[\protect\citeauthoryear{Wolfe \& Sorensen}{2000}]{Wolfe2000}
Wolfe, W.~J., and Sorensen, S.~E.
\newblock 2000.
\newblock Three scheduling algorithms applied to the earth observing systems
  domain.
\newblock {\em Management Science} 46(1):148--168.

\end{thebibliography}
